We use cookies to track visitor statistics and personalise adverts. This info is shared with Google. Only use the site if you agree to this. OK, I agree

Cromarty Image Library

Peter Bursztyn

Energy is my passion

Wind Power One of the boats from the Flotilla in front of the second Beatrice turbine.
Second Beatrice turbine with blade safely attached This is the second of two wind turbines being assembled at Nigg to be installed offshore in the Beat...
Talisman Wind Turbine leaving Nigg The first of two wind turbines to be installed in the Beatrice field leaving Nigg where it was assem...
Beatrice field windmill 1 in position Showing the windmill a mile or so south of the Beatrice Alpha. Picture #1716 shows the windmill bei...

Latest Pics

New PictureNew PictureNew PictureNew PictureNew PictureHMS Queen Elizabeth aircraft carrierNew PictureCaptain Backs  Memorial Memorial to Captain Back Hms NatalMemorial to Captain Back of H.M.S Natal